Microtunnelling and direct pipe
1326 – Cuvilly (France)
Works:
Pipeline for natural gas transport. Arc de Dierrey Project. Lot 1 “Tronçon Cuvilly-Betz”. Underground crossing of Oise river and of road D200.
Customer:
Grt Gaz / Max Streicher GmbH
Period of Execution:
October 2014 - March 2015
Works Amount:
€ 1.291.489,00
Description
The microtunnel is part of the special works included in Lot 1 of the gas transport pipeline project “Arc de Dierrey”. The microtunnel was designed to cross the navigable Oise river and the four-lane, fast traffic, departmental road D200. During the drilling, good production rates were recorded, with peak productions of 40 m per day.