Foundations and special underground works

1397 – Barilla New Automatic Warehouse – Pedrignano (Parma – Italy)

Works:
Executions of special foundations and consolidation works for the construction of the New Automatic Warehouse located alongside the existing Automatic Warehouse and powered by the current "C" section of the finished product Warehouse of the Barilla plant in Pedrignano (PR).

Customer:
BARILLA G. e R. Fratelli - S.p.A.

Period of Execution:
April 2018 - September 2018

Works Amount:
€ 3.454.281,00

Description

Installation of ground consolidation piles in order to reduce and adjust the area for the warehouse basement (about 150 m x 45 m). It was a complex work due to the huge dimensions and the rather unfavourable subsoil conditions. The piles have been executed with the bored casing pile technology. The piles (with a centre-to-centre distance ranging from 4,20 m to 5,90 m) have different lengths: from 39 to 50 m.